IFC/WB Funded Projects
Name of the Project | Locations | Client | Period | |
Power Plant Sector |
||||
1. | Abdul Monem Economic Zone Ltd. (AMEZ) | Munshigonj, AMEZ | Abdul Monem Ltd. | June 15- Dec |
2. | Technical assistance for the BEPZA Comilla CETP project, Funded by IDCOL. | Comilla EPZ | IDCOL | Dec, 12-
Jan, 13 |
3. | Technical assistance for the BEPZA CETP projects at Dhaka and Chittagong EPZ CETP. | Dhaka &Chittagong EPZ CETP. | IFC | Mar 11- Mar 12 |
4. | External Training Coordinator, Management of CETPs in IIT Powai, Mumbai, India, ECL | Mumbai and Gujrat, India | IFC | Oct 11- Nov 11 |
5. | Environmental and Social Impact Assessment for the Northern Areas Poverty Reduction Initiative (NARI) Project
|
Dhaka EPZ, Karnaphuli EPZ in Chittagong, and Ishwardi EPZ. | IFC | Jan 11-Jun 11 |
6. | IEE and EIA Including EMP study for obtaining Site Clearance Certificate (SCC) and Environmental Clearance Certificate (ECC) From DoE, Bheramara 110 MW HSD based Rental power plant. | Bheramara, Kushtia, Bangladesh. | Quantum Power System Ltd. | Mar 10-May 11 |
7. | IEE and EIA Including EMP study for obtaining Site Clearance Certificate (SCC) and Environmental Clearance Certificate (ECC) From DoE, Noapara 105 MW HFO based Rental power plant. | Noapara, Jessore, Bangladesh | Quantum Power System Ltd. | Mar 10-Apr 12 |
8. | Initial Environmental examination (IEE) and Environmental Impact Assessment (EIA) studies ECPV Chittagong Ltd. 108 MW HFO Power Plant, has obtained Site Clearance and Environmental Clearance Certificates from Department of Environment (DoE) | Chittagong, Bangladesh | ECPV Chittagong Limited | Nov 11-Sep |
9. | Initial Environmental examination (IEE) and Environmental Impact Assessment (EIA) studies Katakhali 50 MW HFO Based Power Plant, has obtained Site Clearance and Environmental Clearance Certificates from Department of Environment (DoE) | Katakhali, Rajshahi | Northern Power System Ltd. | Mar 10-Apr 11 |
10. | Environmental Monitoring (Air, Noise, S.W, G.W) of 335MW Combined Cycle Gas Turbine (CCGT) Plant power project. Phase II. | Meghna Ghat, Bangladesh | BPDB | Jul 14 To Jun15 |
11. | Initial Environmental examination (IEE) & Social Environmental Impact Assessment (SEIA) & Environmental Monitoring studies Bibiyana South 78 MW Combined Cycle Power Plant. | Habiganj, Bangladesh | Bibiyana South Cycle Power Plant. | Mar 10 To Nov 11 |
12. | Environmental Monitoring of Siddirganj 335 MW Combined Cycle Power Plant Project | Siddhirganj, Narayanganj Bangladesh | EGCB | Jun 14 -Jul 15 |
13. | DLN Tuning of Siddirganj 335 MW Combined Cycle Power Plant Project | Siddhirganj, Narayanganj Bangladesh | EGCB | Jun 16- Sep 16 |
14. | Ghorashal Unit 4 Re powering Project. | Ghorashal, Narshingdi | BPDB | Apr17-Continue |
15. | Ambient Noise Level Measurement and Analysis of Ashuganj 450 MW CCPP (NORTH) | Ashuganj, B-Baria-3402, Bangladesh | APSCL | 24th – 31st May, 17 |
16. | Natural Gas Testing and Analysis of Ashuganj 450 MW CCPP (NORTH) | Ashuganj, B-Baria-3402, Bangladesh | APSCL | 24th May, 17 To Date |
17. | Environmental Monitoring of 7.5 MW Off-Grid Wind – Solar Hybrid System with Diesel Generator | Hatiya, Noakhali | BPDB | Aug-14 Sep 14/ Apr13 |
18. | Environmental Impact Assessment (EIA), Social and Resettlement Action Plan (RAP) of Extension of Gas Distribution Network | Bhola, Bangladesh | SGCL | May 15 – Sep 15 |
19. | IEE, EIA, SIA and RAP study for feasibility study of PGCB’s Transmission System Improvement in West Zone Part – 3 | West Zone, Bangladesh | PGCB | Apr, 14 –Jul 15 |
20. | Construction of new 230 kv double circuit T/L Ishurdi- Rajshahi
230 kV In-Out for Jhinnaildaha 230 kV Substation Construction of new 132 kV double circuit T/L Gopalganj – Khulna South Construction of new 132 kV double circuit T/L Baghabari- Bhangura 132 kV double circuit In – Out connection for Pansha ( Rajbari) New 132/33 kV S/S Mithapukur |
Greater Rajshahi,
Jhinaiddaha, Gopalganj, Khulna Shahzadpur,Sherajgonj, Pabna, Rajbari, Rangpur, Union, Sathi Bari Upazella,Mithapukur Mouza: Kathali |
PGCB | April 2014- Continue |
21. | DLN Tuning of Fenchuganj CCGT Power Plant. | Fenchuganj, Sylhet | BPDB | May 17-May 17 |
22. | DLN Tuning of Shajibazar Power Plant. | Habigonj, Sylhet | Shahjibazar Power Co Ltd | Jan 17-Jan 17 |
23. | Monitoring and Analysis for IEE, EIA & EMP Northern Power System Ltd. Katakhali 50 MW HFO Based Power Plant | Katakhali, Rajshahi | Northern Power System Ltd. | Mar 10-Apr 11 |
24. | Monitoring and Analysis for IEE, EIA & EMP | Bangladesh | Northern Power System Ltd. | Mar 10 – Apri, 11 |
25. | IEE, EIA for Mubarakpur Oil/Gas Exploration Well Drilling Project | Bangladesh | BAPEX | Oct, 10 – Dec, 12 |
26. | IEE of Bangladesh Gas Field Company Limited | Bangladesh | BGFCL | Jun 13-Nov 14 |
27. | Meghna River Surface Water Quality Monitoring | Chaitankanda, Bishnondi, Meghna River | Dhaka WASA | Feb 14- Continue |
28. | PBE4S16022 (Deltares#120919 Innovative Monitoring And Reporting For Sustainable Water Quality Of Meghna River | Meghna River, Bangladesh | DoE | Feb17-Continue |
29. | Strengthening Monitoring and Enforcement in the Megha River for Dhaka’s Sustainable Water Supply. PTA-42173-014-Ban: | Meghna River Bangladesh | DoE | Nov. 2015- date |
30. | Strengthening Monitoring and Enforcement in the Meghna River for Dhaka’s Sustainable Water Supply | Meghna River Bangladesh | DWASA | Oct 15 -Present |
Work Experiences in Transportation Sector |
||||
31. 24. | Environmental Impact Assessment (EIA) of Construction of link road from Dhaka Trunk road to Baizid Bostami Road including loop road outer periphery of AUW project. | Bangladesh | Chittagong Development Authority (CDA) | Dec 16-Apr 17 |
32. | Baseline Environmental Survey of Greater Dhaka Sustainable Urban Transport Project (Package-2) | Bangladesh | BRTA | May 14 – Feb 15 |
33. | Greater Dhaka Sustainable Urban Transport project (Package 2) | Dhaka Airport to Gazipur Bus Terminal | RHD | May 14- Continue |
34. | Construction of Road, Bridge and Culvert from Madani Avenue-Barabaraid to Dhaka-Sylhet Highway near Bhulta via Navagram | Narayangong, Dhaka | DWASA | June 17-ongoing |
35. | Baseline Environmental Survey of Greater Dhaka Sustainable Urban Transport Project | Airport to Gazipur | Roads & Highway | December
14 |
36. | Regional Cooperation and integration Project | Dhuhajari, Cox Bazar via Ramu | Bangladesh Railway | Nov 12- Sep14 |
37. | Baseline Environmental Survey and Environmental Monitoring (Air, Noise, Water) of Dhaka Urban Transport Network Development Study (DHUTS) By JICA | Pallabi to Syedabad | Dhaka City Corporation | Apr11 |
Social and Socio-Economic Survey Related Task |
||||
Feasibility Study of Environmental and Social Assessment of Sheola, Bhomra and Thegamukh Land Port). | Sheola, Bhomra and Thegamukh, Bangladesh | BLPA | Mar 16-Oct 16 | |
Work with Energy and Gas field |
||||
Resettlement Plan of Gas Seepage Control and Appraisal & Development of Titas Gas Field | Bangladesh | BGFCL | Jun, 13 – Sep. 14 | |
40. | Identification of gas seepage and its control from Titas gas field and preparation of environmental management plan (EMP) of BGFCL and Brahmanbaria. | Brahambaria | BGFCL | 2009 |
41. | IEE and EIA Mobarakpur Oil/Gas Exploration Well Drilling Project of BAPEX of well #1 at Paglachandipur, Khetupara, Santhia, Pabna.
|
Pabna | BAPEX | 10-11 |
42. | Incinerator Flue Gas and Ambient Air Monitoring | Sylhet | Chevron Bangladesh Ltd. | Continue |
ETP Work with industrial Sector |
||||
Design and Construction supervision of ETP | Gazipur | Eskeyef Bangladesh Ltd. | Dec 07 – May 2008 | |
44. | Preparation of Design, drawing, supervision of Construction work and electrical, mechanical installation, commissioning of ETP. | Tejgaon Industrial area | Sonargaon Dyeing and Printing Ltd. | Mar08 – Apr09 |
45. | Treatability study of effluent, design, drawing supervision of civil and E/M equipment installation of ETP. | Chittagong | GlaxoSmithKline Bangladesh Ltd. | Jun 09 – May 10 |
46. | “Private Public Partnership Options for Industrial Wastewater Treatment and Reuse in Greater Dhaka” Jointly with Euroconsult Mott MacDonald, Finance by World Bank, August 2009 to February 10. | Greater Dhaka Area | World bank | 09-10 |
47. | Design, drawing, supervision of Civil work of ETP, ETP equipment installation of Novarties Pharmaceutical Ltd. | Cherag Ali, Tongi, Gazipur | Novarties Pharmaceutical Ltd. | Jun09 – May 10 |
48. | Design, drawing, supervision of Civil, E/M equipment installation of ETP of United Sugar Mills Ltd. | Meghnaghat, Sonargaon, Narayangonj | United Sugar Mills Ltd. | May 09 – Jul 10 |
49. | Design and Construction supervision of ETP | Manikgonj | Bashundhara Steel, Ltd | Apr08 – Dec 08 |
50. | Preparation of IEE report for site clearance, EIA report for Environmental clearance from DOE and design, drawing supervision of ETP. | Tongi, BSCIC Industrial Area | Phoenix Home Textile. | 08 |
51. | EIA, EMP, ETP study of United Sugar Mills Ltd. | Meghnaghat,
Sonargaon, Narayangonj |
Meghnagroup of industries | 09 |
IEE, EIA and EMP work in Different Sector |
||||
52. | Environmental Impact Assessment (EIA) of 06 (Six) Full Fledge TV Stations of Bangladesh Television | 6 Division, Bangladesh | BTV | May 17-Present |
53. | Initial Environmental Examination (IEE), Environmental Impact Assessment (EIA) and Environmental Management Plan (EMP) of HMCL Niloy Motors Bangladesh Ltd. | Bangladesh | HMCL Niloy Bangladesh ltd. | Jul 15-Jan 17 |
54. | Environmental Impact Assessment (EIA) of tentative 11 (Eleven) nos Bridges over different river at different district. LGED. | 4 District of Bangladesh | LGED | May 15 –Jul 15 |
55. | Stack Emission, Ambient Air, Noise and Water Monitoring | Chatak,
Sunamgonj |
Lafarge Surma Cement Ltd | Continue |
56. | Public Private Partnership Project (PPP) titled SAVE covered by a contract entered into between ECCI and PUMA. | |||
57. | IEE, EIA, EMP of CETP | Narsingdi | Thermax Group of industries | 2009 |
58. | IEE, EIA and EMP | Pahatoli
Chittagong. |
Asian University for Women | 2010 |
59. | Preparation of EMP and obtaining ECO form DoE of BPML, BNDBIL, BTIL, BSCL | Bashundhara
Group |
Munshigonj, Narayangong and Manikgong | 1997 |
60. | EIA of Chemical Industries | BSCIC,
industrial area, Tangail |
Rainbow Chemicals Ltd. | 2008 |
61. | EMP of ETP Bashundhara Steel Complex Ltd. | Jagir, Manikgonj | Bashundhara Steel Complex Ltd. | 2007 |
62. | EMP of Novarties Pharmaceutical Ltd. | Cherag Ali, Tongi, Gazipur | Novarties
Pharmaceutical Ltd. |
2009 |
63. | EMP of fume extraction Anwar Ispat Ltd. | Tongi, Gazipur | Anwar Ispat Ltd. | 2008 |
64. | EMP, ETP of Bashundhara Tissue Industries Ltd. | Anarpur,
Munshigonj |
Bashundhara Group of Industries | 2009 |
65. | Industrial Environmental Audit | Tongi BSCIC l/A, Tongi l/A and
Narayangoni |
IWM | 2006 |
66. | Environmental Awareness, capacity building and environmental monitoring services | Dhaka | Meghna Group of Industries. | 2008 |
67. | Environmental Awareness, capacity building and environmental monitoring services | Meghna Group of Industries. | Meghna Ghat Power Ltd. | 2008 |
68. | EMP of Air Pollution Control System (APCS) of Anwar Ispat Ltd. | Tongi, Gazipur | Anwar Ispat Ltd. | 2008 |
69. | EMP of Air Pollution Control System (APCS) of Bashundhara Still Ind. Ltd | Jagir,’Manik gonj | Bahshundhara Group of Companies | 2009 |
Sector Wise Experiences
Roads
Bus Rapid Transport (BRT) RHD, LGED and Pourashavas roads, Kaliakoir Hi-Tech Park alternative road.
Bridges and Culvert for Road Transport
Eleven LGED bridge of various places of Bangladesh, Bhairab bridge, Saltia in Gofargaon Bridge and Gulshan-Bananai bridge
Bridges and Culvert for Rail Transport
New railway line from Dohazari to Cox’s Bazaar Via Ramu and Ramu to Gumdum near Mayanmar Border, one bridge 288 m, two bridges with 240 m and two bridge more that 100m span, 42 bridges and 201 culvert.
Environmental Monitoring, Test Analysis and Preparation of Monthly and Quarterly Monitoring Report
Water (Ground, surface, and drinking) quality, Industrial and domestic Wastewater quality, sludge, ambient air, stack emission, noise pollution of Industrial unit, power plant, textile dyeing and washing, brick kiln sector, power sectors, cement, paper, steel, roads, overpass, etc.
Environmental Monitoring and Data Acquisition
Design of environmental planning and monitoring of various data, climate and weather data logged remotely from weather stations, overall management, preparation of monthly monitoring program and preparation of report
Oil, and Gas Sector
Dr. Saha worked on identification of gas seepage and its control from Titas gas field of BGFCL, IEE and EIA study of AB Pipe line, metering system, compressor station, seepage control and appraisal of gas field, EIA study of Titas location-7 to Ashuganj-Bakhrabad pipeline (near MLV-1) of GTCL, EIA study of Mobarakpur Oil/Gas Exploration Well Drilling Project of BAPEX, “Gas Distribution Network of Rajshahi City and It’s Adjoining Area” under Pashchimanchal Gas Co. Ltd. (PGCL), field appraisal (3-d seismic) of Titas, Bakhrabad, Sylhet, Kailastila and Rashidpur gas field, IEE and EIA study of Sahahbazpur Gas Field Appraisal and Development Project and Preparation of report of Bangladesh Petroleum Exploration Ltd. (BAPEX), IEE and EIA study of Srikail Exploration Well Drilling Project. EIA of Extension of Gas Distribution Network in Bhola
& New Network at Borhanuddin and IEE and EIA of Heavy Condensate Fractionate Plant of Bashundhara Oil and Gas Company Ltd.
Gas Field and Power Plant Environmental Monitoring
Chevron Gas Fields at Sylhet region. Tallow Gas field at Bangura, Gopalnagar Comiila, Siddhirgonj 335 MW CCPP and Ashugonj 450 MW GT CCPP.
Power Sector
Feasibility Study of PGCB’s Transmission System Improvement In West Zone Part-3, 132 KV Transmission Line Project of Power Grid Company of Bangladesh (PGCB), EIA report of Shahjibazar 60MW Gas Turbine Power Plant Project. IEE and EIA study of 110 MW Bheramara and 105 MW Noapara power plant of Quantum Power System Ltd. 50MW Northern Power System Ltd EIA study and EnergyPac and Confidence Ltd. 105 MW Power Plant.
Automobile Sector: IEE and EIA, Occupational Health and Safety
Environmental, Occupational Health and Safety Specialist of HMCL Niloy Bangladesh Ltd, Runner Automobile Ltd., and Dutchbangla Pack Ltd.
Coal Mine
ECL also worked as environmental specialist of GIS based environmental assessment of Phulbari Coal Mine and Coal Transportation Project and environmental monitoring and analysis. Preparation of GIS based industrial map based on GPS Survey.
Land Port, River Port and Jetty
Bhomra, Shaula and Thegamukh Land Port, Noapara river port and Cox’s Bazar Jetty
Landfill Site
Municipal landfills sites
Disaster Management
Pourashava Master Plan under UGIIP-III
Water Supply Wastewater Treatment
Abdul Monem Economic Zone and Dhaka Water Supply Network Improvement Project (DWSNIP)
CETP
- Appraisal of the Conceptual and Technical Design of the Project Central Effluent Treatment Plant at Comilla Export Processing Zone (CEPZ). Infrastructure Development Company Limited (IDCOL)
- Technical assistance for the BEPZA CETP projects at Dhaka EPZ and Chittagong EPZ funded by BICF
- Thermax Yarn Dyeing LTD and Adury Dyeing Ltd CETP at Narsingdi.
ETP
Designed the following ETP-Pakiza Dyeing and Printing Industries Ltd., Phoenix Home Textile Ltd., Eskayef Bangladesh Ltd., Sonargaon Dyeing & Printing Industries Ltd., Bashundhara Steel, Complex Ltd., How Are You Textile Industry Ltd., Bashundhara Paper Mills Ltd., Modina Dyeing Printing and Processing Idustries Ltd., Tua-Ha Textile Industry Ltd., Bashundhara Newsprint and Duplex Board Industries Ltd., Molla Dyeing and Printing Industries Ltd., United Sugar Mills Ltd., Shepherd Industries Ltd., Novartis Pharmaceutical Bangladesh Ltd., GlaxoSmithKline Pharmaceutical Ltd.
- Pakiza Dyeing and Printing Industries Ltd.
- Phoenix Home Textile Ltd.
- Eskayef Bangladesh Ltd.
- Sonargaon Dyeing & Printing Industries Ltd.
- Bashundhara Steel Complex Ltd.
- How Are You Textile Industry Ltd.
- Bashundhara Paper Mills Ltd.
- Modina Dyeing Printing and Processing Industries Ltd.
- Bashundhara Newsprint and Duplex Board Industries Ltd.
- Molla Dyeing and Printing Industries Ltd.
- United Sugar Mills Ltd.
- Shepherd Industries Ltd.
- Novartis Pharmaceutical Bangladesh Ltd.
- GlaxoSmithKline Pharmaceutical Ltd.
Designed a number of ETP, WTP, individual as well as cluster of industries treatment plant. Redesign of non-functional ETP, process and chemical optimization, reuse of process water. Water supply in rural area, Industrial and domestic water pollution, air pollution, monitoring and analysis of water, wastewater, sludge, air, dust, soil, meteorological data, noise and vibration etc.
WTP
EIA of 2000 MLD Khilkhet Water Treatment Plant
STP
Design of AUW Central sewage treatment plant and 100 cum/day effluent capacity STP.
APCS
Design of Air Pollution Control System (APCS), Preparation of EMP, Design and implementation of air pollution control system of Mohammadi Steel Works Ltd., Anwar Ispat Ltd. and Bashundhara Steel Ltd APCS
Modeling
Modeling of air quality for PM2.5, PM10, TSP, SO2, NOx, Noise quality, surface water (Stream) and Industrial effluent quality impact.
Cleaner Production (CP), Environmental and Energy Audit
Assessment of cleaner production, energy efficiency, and industrial environmental audit based on ISO 14010 and 19011 compliances. Occupational Health and Safety, Climate change, Greenhouse gas emission assessment and inventory, preparation of report, workshop presentation, and finalization of report.
Resettlement Plan
Resettlement policy frame work and resettlement action plan (RAP).
Social Study
Social study at Comilla EPZ extension
Climate Change
GHG inventory of 1st National communication of UNFCCC
Arsenic Management
Arsenic mitigation and sludge management.
Provided Training Program
- Provided training on energy efficient, energy, water and waste management
- Water Quality, Pollution Characterization, EQS, Laboratory test and analysis method of testing and Water Treatment Technology
- Training on IEE, EIA and EMP of Pourashavas Water Treatment Plant
- Training on ETP and CETP
- External training on CETP
Coordinated and also provided training on Environmental Awareness and Environmental Monitoring (Air, water and wastewater) Program as a resource person.
Capacity Building Program:
worked as team leader and build Capacity on water supply, sanitation, solid waste management, infrastructure and environmental improvement through training and information management system development in Local Government mainly in Municipality, Community mobilization through participatory and partnership approach (PPA).
Report Preparation
Prepared project proposals, Tender document (RFP), evaluation of tender, preparation of term of Reference (TOR) and monthly, quarterly, intermittent report, draft and final reports.