| PDS No | Name of the Project | Locations | Client | Funded | Duration |
|---|---|---|---|---|---|
| 1 | Feasibility Study & Detail Design for the Drainage System Improvement including Relocating the Drainage Outfall in Chapai Nawabganj Municipality Project (FSDDDSCMP)-(S- 01). | Chapai Nawabganj, Bangladesh | Local Government Engineering Department (LGED) | GoB | Dec 2025-Jun 2026 |
| 2 | EIA study of Conversion of Metre Gauge line into Dual gauge Line of Parbatipur to Kaunia station under Bangladesh Railway. | Dinajpur and Rangpur | Bangladesh Railway | ILoC | Nov 2023 to Jan 2024 |
| 3 | Update of IEE and Environmental & Social Impact Assessment (ESIA) study, stakeholder consultation, assessment and Quarterly Environmental Monitoring, Test Analysis. | Badda, Dhaka | BRACU | IDCOL | Oct 2023 to Nov 2023 |
| 4 | Preparation of Environmental and Social Due Diligence (ESDD) Study Report for ADB for Compliance issues for BRAC University. | Badda, Dhaka | IDCOL | IDCOL | May 2023 to Sep 2023 |
| 5 | IEE of Laying of Optical Fibre Submarine Cable at Cox's Bazar and obtaining Site and Environmental Certificate. | Deep Sea Cox's Bazar | Bangladesh Submarine cable Company Ltd, (BSCCL) | BSCCL | May 2023 to Sep 2024 |
| 6 | EMP and 20 m3/hr. ETP of Automation of Main Installations of Padma Oil Company Ltd., at Patenga, Chattogram, Bangladesh. | Potenga, Chattogram | Padma Oil Company Ltd. | GoB | Sep 2022 to Sep 2025 |
| 7 | EMP and 20 m3/hr. ETP of Automation of Main Installations of Jamuna Oil Company Ltd., at Patenga, Chattogram, Bangladesh. | Potenga, Chattogram | Jamuna Oil Company Ltd | GoB | Sep 2022 to Sep 2025 |
| 8 | EMP and 20 m3/hr. ETP of Automation of Main Installations of Meghna Petroleum Ltd.) at Patenga, Chattogram, Bangladesh. | Potenga, Chattogram | Meghna Petroleum Ltd. | GoB | Sep 2022 to Sep 2025 |
| 9 | Resettlement Plan (RP) for Approach Channel at Old Brahmaputra River and Adjacent Connecting Road to Project Site under Mymensingh 420 MW Dual Fuel (Gas/HSD) Combined Cycle Power Plant Project | Sambhugonj, Mymensingh Power Station | EMPRESARIOS AGRUPADOS and IRG Development Services Ltd. | RPCL/ GoB | Nov to 2023 Sep 2022 |
| 10 | EIA and EMP of Automation of Main Installations of Three Oil Marketing Companies (Padma Oil Company Ltd., Jamuna Oil Company Ltd., and Meghna Petroleum Ltd.) at Patenga, Chattogram, Bangladesh. | Potenga, Chattogram | Bangladesh Petroleum Corporation (BPC) | GoB | May 2022 to Sep 2025 |
| 11 | Environmental & Social Impact Assessment (ESIA) study of “Support to Implementation of Environmental and Social Safeguard Consultancy Services under WeCARE (Phase-I): (RCMLIIP)Local Government Engineering Department (LGED), [IDA Credit No. 6684-BD] (Package No.: SP-04). WB funded Project. Preparation of ESIA, ESMP, SSESMP, Design review of roads, bridge, culvert and market, RAP, LAP, GBV, SEA- SH, GRM. Implementation of ESMP and RAP | 4 Districts of Bangladesh, Jashore, Magura, Jhenaida, Chuadanga. | LGED (WB and AIIB Funded) | WB and AIIB | Mar 2022 to Present |
| 12 | Elephant Conservation & Human Elephant Resolution under SUFAL Project (SD 40). | Coxs Bazar, Moulavi Bazar & Sherpur districts | Bangladesh Forest Department (BFD) | GoB | Oct 2021 to Present |
| 13 | Environmental and Social Due Diligence (ESDD) report of Doreen Hotels and Doreen Suites Project | Gulshan-2 | Doreen Hotels and Resorts Ltd. | IDCOL/ ADB | Oct 2021 to Nov 2021 |
| 14 | Feasibility study of Environmental Impact Assessment (EIA) and Social Impact Assessment (SIA) Study of Khulna Agricultural University (KAU) at Khulna. | Khulna | Khulna Agricultural University | GoB | Jun 2021 to Feb 2202 |
| 15 | ESIA study of CAPEX/BMRE for upgradation and modernization of existing core network infrastructure and strengthening of overall network capacity by Robi Axiata Limited (Robi). | Whole Bangladesh | Robi Axiata Ltd. (Robi) | IDCOL | Jul 2020 to Feb 2022 |
| 16 | Emission monitoring and DLN Tuning of RPCL 350 MW Combined Cycle Power Plant Project | RPCL, Mymensingh | GE | GoB | Sep 2021 Sep 2021 |
| 17 | Identification, Prioritization and Prefeasibility of Potential projects under Roads and Highways Department | Whole Bangladesh | World Bank | WB | Feb 2021 to Dec 2022 |
| 18 | Emission monitoring and DLN Tuning of 330 MW CCPP Shajibazar Power Plant Unit #2. | Habigonj, Sylhet | GE | GoB | Sep 2020 to Sep 21 |
| 19 | Environment and Social Impact Assessment (ESIA) for the construction of 12 Storied Building of Janata Tower Software Technology Park (STP-2). | Kawran Bazar C/A, Dhaka. | Bangladesh Hi-Tech Park Authority (BHTPA) | GoB | Oct 2019 to Jan 2020 |
| 20 | Environmental Assessment (EA) of Chattogram Software Technology Park (CSTP) | Agrabad on which Singapore- Bangkok Market | Bangladesh Hi-Tech Park Authority (BHTPA) | GoB | Apr 2019 to Nov 2019 |
| 21 | Environmental Assessment (EA) of Rajshahi ICT Cum Incubator Training Center | Nabinagar mouza of Paba upazila at Rajshahi district | Bangladesh Hi-Tech Park Authority (BHTPA) | GoB | Apr 2019 to Nov 2019 |
| 22 | Environmental & Social impact Assessment (ESIA) Study of Asian University for Women support Foundation (AUWSF). | Chattagram, Bangladesh | Asian University for Women Support Foundation (AUWSF) | WB | Feb 2019 to Jan 2020 |
| 23 | Environmental & Social Impact Assessment (ESIA) Study of Sena Edible Oil Industries Ltd. | Narayangonj, Bangladesh | Sena Edible Oil Industries Ltd. | IDCOL | Jan 2019 to Nov 2019 |
| 24 | Consultancy Services for Route Survey with IEE, RAP Study & Topographical Survey of Modhunaghat-Moheshkhali and Modhunaghat-Bhulta 765Kv Transmission Line Project | Modhunaghat- Moheshkhali and Bhulta | PGCB | WB | Dec 2018 to May 2019 |
| 25 | Environmental & Social impact Assessment (ESIA) Study of Seven Ring Cement | Gazipur, Dhaka Bangladesh | Shun Shing Group | IDCOL | Dec 2018 to Jun 2020 |
| 26 | Environmental & Social impact Assessment (ESIA) Study of Shun Shing Cement | Gazipur, Dhaka Bangladesh | Shun Shing Group | IDCOL | Dec 2018 to May 2019 |
| 27 | Conducting Study on Physical Environment (WasteManagement) of Microenterprises of Promoting Agricultural Commercialization and Enterprises (PACE) Projectâof PKSF | 22 Districts in Bangladesh | PKSF | PKSF | Jun 2018 Nov 2018 |
| 28 | Master plan of climate change, environment and disaster management. | 6 District | LGED | ADB | Oct 2017 Jan 2018 |
| 29 | Ghorashal Unit 4 Re Powering Project. | Ghorashal, Narshingdi | BPDB | WB | Apr 2017 to Dec 2019 |
| 30 | Ambient Noise Level Measurement and Analysis of Ashuganj 450 MW CCPP (NORTH) | Ashuganj, B-Baria-3402 | APSCL | ADB | Apr 2017 to May 2017 |
| 31 | Natural Gas Testing and Analysis of Ashuganj 450 MW CCPP (NORTH) | Ashuganj, B-Baria-3402 | APSCL | ADB | May 2017 to Jul 2017 |
| 32 | PBE4S16022 (Deltares#120919 Innovative Monitoring and Reporting for Sustainable Water Quality of Meghna River | Meghna River, Bangladesh | ADB/DoE | GoB | Feb 2017 to Dec 2018 |
| 33 | Updating of EIA study, (Intake structure, raw water transmission, treatment plant, treated water transmission and distribution, River and road crossing, Wastewater and sludge management.), Geotechnical investigation for bore hole drilling for pipe installation, EMMP and prepare comprehensive EIA report | Bisnandi point of Meghna river to Uttara | Dhaka WASA | GoB | Aug 2017 to May 2018 |
| 34 | Pre-Feasibility Study of Recirculating Aquaculture System (RAS) | Beltia, Jamalpur | Brahamaputra Trade International | Private | Oct 2017 Jan 2018 |
| 35 | Construction of Road, Bridge and Culvert from Madani Avenue-Barabaraid to Dhaka-Sylhet Highway near Bhulta via Navagram | Narayangong, Dhaka | RAJUK | RAJUK | Jun 2017 to Nov 2018 |
| 36 | Environmental Impact Assessment (EIA) of 06 (Six) Full Fledge TV Stations of Bangladesh Television | 6 Division, Bangladesh | BTV | GoB | May 2017 to Sep 2017 |
| 37 | Emission monitoring and DLN Tuning of Fenchuganj CCGT Power Plant. | Fenchuganj, Sylhet | BPDB | GoB | May 2017 to May 2017 |
| 38 | Quarterly Environmental monitoring of Ghorashal Unit 4 Re powering Project. | Ghorashal, Narshingdi | BPDB | WB | Apr 2017 to Dec 2019 |
| 39 | EMP implementation of Environmental quality (Ambient air, Noise, water, wastewater, Soil) monitoring of Ghorashal Unit 4 Re powering Project. | Ghorashal, Narshingdi | BPDB | WB | Apr 2017 to Dec 2019 |
| 40 | Emission monitoring and DLN Tuning of Shajibazar CC Power Plant. | Habigonj, Sylhet | Shahjibazar Power Co Ltd | GoB | Jan 2017 Jan 2017 |
| 41 | Environmental Impact Assessment (EIA) of Construction of link road from Dhaka Trunk Road to Baizid Bostami Road including loop road outer periphery of AUW project. | Chattogram | Chittagong Development Authority (CDA) | Chittagong Development Authority (CDA) | Dec 2016 to Apr 2017 |
| 42 | Emission monitoring and DLN Tuning of Siddirganj 335 MW Combined Cycle Power Plant Project | Siddhirganj, Narayanganj | EGCB | GoB | Jun 2016 to Sep 2016 |
| 43 | Feasibility Study of Environmental and Social Impact Assessment (ESIA) of Sheola, Bhomra and Thegamukh Land Port). | Sheola, Sylhet, Bhomra Satkhira and Thegamukh, Rangamati | Bangladesh Land Port Authority (BLPA) | World Bank | Mar 2016 to Oct 2016 |
| 44 | Water supply and central wastewater treatment (CETP) 1,166 m3/hr and design of Abdul Monem Economic Zone Ltd. (AMEZ) | Munshigonj, AMEZ | Abdul Monem Ltd. | Abdul Monem Group | Jun 2015 to Dec 2015 |
| 45 | Initial Environmental Examination (IEE), Environmental Impact Assessment (EIA) and Environmental Management Plan (EMP) of HMCL Niloy Motors Bangladesh Ltd. | Bangladesh | HMCL Niloy Bangladesh Ltd. | Nitol Niloy Group | Jul 2015 to Jan 2017 |
| 45 | Strengthening Monitoring and Enforcement in the Megha River for Dhaka Sustainable Water Supply. PTA-42173-014-Ban: | Meghna River Bangladesh | ADB/DoE | GoB | Nov 2015 to Dec 2018 |
| 46 | Environmental Impact Assessment (EIA) of Tentative 11 (Eleven) nos Bridges over different river at different district. LGED. | 4 District of Bangladesh | LGED | GoB | May 2015 to Jul 2015 |
| 47 | Environmental Impact Assessment (EIA), Social and Resettlement Action Plan (RAP) of Extension of Gas Distribution Network | Bhola, Bangladesh | SGCL | ADB | May 2015 to Sep 2015 |
| 48 | Field history of aquifer study, Identify the Bore well location, DTW drilling, aquifer and suitable water quality layer, soil and water testing, Overall supervision, preparation of bore log, design and construction of TW | Rajshahi | ACI Godrej (India) Agrovet Private Ltd. | ACI Godrej (India) | Apr 2015 to Sep 2015 |
| 49 | Environmental Monitoring Noise of 7.5 MW Off-Grid Wind Solar Hybrid System with Diesel Generator in Hatiya, Noakhali. | Hatiya, Noakhali | BPDB | BPDB | Aug 2014 to Sep 2014 |
| 50 | Monthly Environmental Monitoring and test nalysis of Siddirganj 335 MW Combined Cycle Power Plant Project | Siddhirganj, Narayanganj Bangladesh | EGCB | WB | Jun 2014 to Jul 2015 |
| 51 | Baseline Environmental Survey and Environmental Quality Monitoring of Greater Dhaka Sustainable Urban Transport Project (Package-2) | Gazipur | BRTA, RHD | ADB | May 2014 to Feb 2015 |
| 52 | IEE, EIA, SIA and RAP study for feasibility study of PGCB's Transmission System Improvement in West Zone Part - 3 | West Zone, Bangladesh | PGCB | WB | Apr 2014 to Jul 2015 |
| 53 | IEE and ESIA of Construction of new 230 kv double circuit T/L Ishurdi- Rajshahi 230 kV In-Out for Jhinnaildaha 230 kV Substation Construction of new 132 kV double circuit T/L Gopalganj - Khulna South | Greater Rajshahi, Jhinaiddaha, Gopalganj, Khulna Shahzadpur, Sherajgonj, | PGCB | WB | Apr 2014 to Jan 2015 |
| 54 | Environmental Monitoring (Air, Noise, S.W, G.W) of 335MW Combined Cycle Gas Turbine (CCGT) Plant power project. | Meghna Ghat, Bangladesh | BPDB | WB | Jul 2014 to Jun 2015 |
| 55 | EMP Implementation and Supervision Env. Monitoring and reporting of Siddirganj 335 MW Combined Cycle Power Plant Project | Siddhirganj, Narayanganj, Bangladesh | EGCB | WB | Jun 2014 to Jul 2015 |
| 56 | EMP Implementation and Supervision environmental monitoring of Ashugonj 450 MW North CCGT PP. | Ashuhganj Power Station Ltd. | EGCB | WB | Jun 2014 to Jul 2015 |
| 57 | Implementation of EMP and Environmental monitoring of EMP of Siddirganj 335 MW Combined Cycle Power Plant Project | Siddhirganj, Narayanganj, Bangladesh | EGCB | WB | Jun 2014 to Jul 2015 |
| 58 | Yearly Environmental Monitoring of Holcim Cement Industries Ltd. | Meghnaghat, Narayangonj | Holcim Cement (BD) Ltd. | Holcim Cement (BD) Ltd. | Apr 2014 to Oct 18 |
| 59 | Quarterly Ambient Air & Ambient Noise Level monitoring of Bibiyana Gas Field, Moulibazar Gas Field, Jalalabad Gas field & Muchi Compression System | Sylhet District | Chevron Bangladesh Ltd. | Chevron Bangladesh Ltd. | Feb 2014 to Jul Ongoing |
| 60 | Stack Emission Monitoring of Dioxin and Furan†at Bibiyana Gas Field & Moulibazar Gas Field | Sylhet District | Chevron Bangladesh Ltd. | Chevron Bangladesh Ltd. | Feb 2014 to Ongoing |
| 61 | Incinerator Flue Gas, (SPM, SO2, NOx, CO, HCl, H2S, Pb Cd and Hg) and opacity Monitoring | Sylhet | Chevron Bangladesh Ltd. | Chevron Bangladesh Ltd. | Feb 2014 June 2014 |
| 62 | Quarterly Ambient Air & Ambient Noise Level monitoring of TULLOW Gas field | Comilla | Krish Energy Ltd. | Krish Energy Ltd. | Feb 2014 to Dec 2018 |
| 63 | Stack Emission Monitoring of TULLOW Gas field | Comilla | Krish Energy Ltd. | Krish Energy Ltd. | Feb 2014 to Dec 2018 |
| 64 | Weekly monitoring of Meghna River Surface Water Quality Monitoring, test analysis and preparation of report | Chaitankanda, Bishnondi, Meghna River | Dhaka WASA | GoB | Feb 2014 Jun 2015 |
| 65 | Public Private Partnership Project (PPP) titled SAVE covered by a contract entered into between ECCI and PUMA. | Dhaka and Gazipur | Asia Society for Social Improvement & Sustainable Transformation (ASSIST) | IFC | Oct 2013 Nov 2013 |
| 66 | Resettlement Plan (RP) of Gas Seepage Control and Appraisal & Development of Titas Gas Field | Brahambaria | BGFCL | ADB | Jun 2013 to Sep 2014 |
| 67 | Environmental impact assessment (EIA) study of 141 KWP solar-diesel hybrid power system for off grid Paratoli union of Raipura, Narshindi | Narshindi | Shouro Bangla Ltd. | Shouro Bangla Ltd. | Mar 2014 to Jun 2014 |
| 68 | IEE of Bangladesh Gas Field Company Limited | Brahambaria | BGFCL | GoB | Jun 2013 to Nov 2014 |
| 69 | EMP Implementation and reporting of Environmental Monitoring (Ambient air, stack emission, Noise, water, wastewater, Soil) of Lafarge Surma Cement Industries Ltd. | Chatak, Sunamganj | Lafarge Surma (BD) Bangladesh Ltd. | Lafarge Surma (BD) Bangladesh Ltd. | Apr 2013 to Jun 2014 |
| 70 | Monthly Environmental Monitoring Lafarge Surma Cement Industries Ltd. | Chatak, Sunamganj | Lafarge Surma (BD) Bangladesh Ltd. | Lafarge Surma (BD) Bangladesh Ltd. | Apr 2013 Jun 2014 |
| 71 | Environmental Study of Installation of a 7.5 MW Off-Grid Wind- Solar Hybrid System with Diesel Generator in Hatiya, Noakhali. | Hatia, Noakhali. | Power Development Board (PDB) | BPDB | Apr 2013 to Sep 2013 |
| 72 | Environmental, Health and Safety EHS) Audit of Meghnaghat-2 Power Plant Construction Site and Reporting. | Meghnaghat-2 Power Plant, Narayangonj | BCAS | EU | Nov 2012 to Dec 2012 |
| 73 | IEE and Environmental Impact Assessment (EIA) Study of Panigram Resort Ltd. | Jashore | Panigram Resort Ltd. | Private | Mar 2012 to Feb 2013 |
| 74 | Technical assistance for the BEPZA Comilla CETP (625m3/hr) project, Funded by IDCOL. | Comilla EPZ | IDCOL | IDCOL | Dec 2012 to Jan 2013 |
| 75 | Regional Cooperation and integration Project | Chattogram, Cox's Bazar | Bangladesh Railway | ADB | Nov 2012 to Sep 2014 |
| 76 | Initial Environmental examination (IEE) and Environmental Impact Assessment (EIA) studies ECPV Chittagong Ltd. 108 MW HFO Power Plant, has obtained Site Clearance and Environmental Clearance Certificates from Department of Environment (DoE) | Chittagong, Bangladesh | ECPV Chittagong Limited | ECPVL | Nov 2011 to Sep 2012 |
| 77 | Steel Industries EMP, Fume Extraction, Design and Installation | Narayangonj | Mohammadia steel Ind. Ltd | Mohammadia steel Ind. Ltd | Oct 2011 Nov 2011 |
| 78 | Preparation of EMP and obtaining ECC form DoE of Basundhara Steel Complex Ltd (BSCL) of Bashundhara Group | Manikgonj | Munshigonj, Narayangong and Manikgong | Bashundhara Group | Oct 2011 Nov 2011 |
| 79 | EMP of Air Pollution Control System (APCS) of Bashundhara Steel Ind. Ltd | Jagir, Manikgonj | Bahshundhara Group of Companies | Bashundhara Group | Oct 2011 Nov 2011 |
| 80 | EMP of Novarties Pharmaceutical Ltd. | Cherag Ali, Tongi, Gazipur | Novarties Pharmaceutical Ltd. | Novarties Pharmaceutical Ltd. | Oct 2011 Nov 2011 |
| 81 | Environmental Awareness, capacity building and environmental monitoring services | Narayangonj | Meghna Ghat Power Ltd. | Meghna Ghat Power Ltd. | Oct 2011 Nov 2011 |
| 82 | External Training, Management of CETPs (Maximum capacity 2,300 m3/hr. at Vapi, Gujrat) in IIT Powai, Mumbai, India, ECL | Mumbai and Gujrat, India | IFC | IFC | Oct 2011 Nov 2011 |
| 83 | Preparation of EMP and obtaining ECC form DoE of BPML, BNDBIL, BTIL, BSCL of Bashundhara Group | Manikgonj, Narayangonj | Munshigonj, Narayangong andManikgong | Bashundhara Group | Oct 2011 Nov 2011 |
| 84 | EMP of ETP Bashundhara Steel Complex Ltd. | Jagir, Manikgonj | Bashundhara Steel Complex Ltd. | Bashundhara Group | Oct 2011 Nov 2011 |
| 85 | Technical assistance for the BEPZA CETP projects at Dhaka (625 m3/hr.) and Chittagong EPZ CETP (1,166 m3/hr.) | Dhaka & Chittagong EPZ CETP. | IFC | IFC | Mar 2011 to Mar 2012 |
| 86 | Quarterly Environmental monitoring of Tallow Gas Field | Comilla | Tallow Eanergy and Chris Energy | Tallow Eanergy and Chris Energy | Apr 2011 to Dec 2017 |
| 87 | Baseline Environmental Survey and Environmental Monitoring (Air, Noise, Water) of Dhaka Urban Transport Network Development Study (DHUTS) By JICA | Pallabi to Syedabad, Dhaka | Dhaka City Corporation | JICA | Apr 2011 to May 2011 |
| 88 | External Training Coordinator, Management of CETPs (Maximum capacity 2,300 m3/hr. at Vapi, Gujrat) in IIT Powai, Mumbai, India, ECL | Mumbai and Gujrat, India | IFC | IFC | Oct 2011 to Nov 2011 |
| 89 | Environmental and Social Impact Assessment for the Northern Areas Poverty Reduction Initiative (NARI) Project | Dhaka EPZ, Karnaphuli EPZ in Chittagong, & Ishwardi EPZ. | IFC | IFC | Jan 2011 to Jun 2011 |
| 90 | Analysis of Structure for Earth Quake Assessment, Novartis Bangladesh Ltd. Cherag Ali, Tongi, Gazipur | Tongi, Gazipur | Novartis Bangladesh Ltd | Novartis Bangladesh Ltd | May 2010 to Jun 2010 |
| 91 | IEE and EIA Mobarakpur Oil/Gas Exploration Well Drilling Project of BAPEX of well #1 at Paglachandipur, Khetupara, Santhia, Pabna. | Pabna | BAPEX | GoB | Oct 2010 to Dec 2012 |
| 92 | STP Design of Asian University for Women Support Foundation (AUWSF). | Chittagong. | Asian University for Women | Asian University for Women | Jul 2010 to Oct 2010 |
| 93 | Design, drawing, and supervision of Civil work of 30m3/hr ETP installation of Modina Dyeing Printing and Processing Industries Ltd., | Mokterpur, Munshogonj | Modina Dyeing Printing and Processing Industries Ltd., | Modina Dyeing Printing and Processing Industries Ltd. | Jun 2010 Dec 2010 |
| 94 | IEE and EIA Including EMP study for obtaining Site Clearance Certificate (SCC) and Environmental Clearance Certificate (ECC) From DoE, Bheramara 110 MW HSD based Rental power plant. | Bheramara, Kushtia, Bangladesh. | Quantum Power System Ltd. | Quantum Power System Ltd. | Mar 2010 to May 2011 |
| 95 | IEE and EIA Including EMP study for obtaining Site Clearance Certificate (SCC) and Environmental Clearance Certificate (ECC) From DoE, Noapara 105 MW HFO based Rental power plant. | Noapara, Jessore | Quantum Power System Ltd. | Quantum Power System Ltd. | Mar 2010 to Apr 2012 |
| 96 | Initial Environmental examination (IEE) & Social Environmental Impact Assessment (SEIA) & Environmental Monitoring studies Bibiyana South 768 MW Combined Cycle Power Plant. | Habiganj, Bangladesh | Bibiyana South Cycle Power Plant. | Chevron BD Ltd. | Mar 2010 to Nov 2011 |
| 97 | Design and supervision of Molla Dyeing Industries Building. | Demra, Narayangonj | Molla Dyeing Industries | Molla Dyeing Industries | Jan 2010 to Mar 2010 |
| 98 | Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) studies Katakhali 50 MW HFO Based Power Plant, obtaining Site Clearance and Environmental Clearance Certificates from Department of Environment (DoE) | Katakhali, Rajshahi | Northern Power System Ltd. | Northern Power System Ltd. | Mar 2010 to Apr 2011 |
| 99 | Stack Emission, Ambient Air, Noise and Water Monitoring | Chatak, Sunamgonj | Lafarge Surma Cement Ltd | Lafarge Surma Cement Ltd | Jan 2010 Dec 2011 |
| 100 | EIA of Basundhara Cement Industries Ltd. | Meghnaghat, Narayangonj | Bashundhara Group | Jan 2010 to May 2011 | |
| 101 | Stack Emission, Ambient Air, Noise and Water Monitoring | Chatak, Sunamgonj | Lafarge Surma Cement Ltd | Lafarge Surma (BD)Bangladesh Ltd. | Jan 2010 Dec 2010 |
| 102 | EMP of Air Pollution Control System (APCS) fume extraction of Anwar Ispat Ltd. | Tongi, Gazipur | Anwar Ispat Ltd. | Anwar Ispat Ltd. | Oct 2009 May 2010 |
| 103 | Environmental Awareness, capacity building and environmental monitoring services | Dhaka | Meghna Group of Industries. | Meghna Group of Industries. | Oct 2009 May 2010 |
| 104 | EMP, ETP of Bashundhara Tissue Industries Ltd. | Anarpur, Munshigonj | Bashundhara Group of Industries | Bashundhara Group | Oct 2009 May 2010 |
| 105 | Design of ETP, drawing supervision of civil and E/M equipment installation of GlaxoSmithKline Bangladesh Ltd. Pharmaceutical Industry turnkey ETP project. | Chittagong | GlaxoSmithKli ne Bangladesh Ltd. | GlaxoSmithKline Bangladesh Ltd. | Oct 2009 to May 2010 |
| 106 | Provide hands on training on ETP operation, maintenance, trouble shooting, sampling and testing, occupational health and safety, reuse of treated effluent, and compliance report preparation. | Chittagong | GlaxoSmithK line Bangladesh Ltd. | GlaxoSmithKline Bangladesh Ltd. | Oct 2009 May 2010 |
| 107 | Private Public Partnership Options for Industrial Wastewater Treatment and Reuse in Greater Dhaka Jointly with Euroconsult Mott MacDonald, Finance by World Bank | Greater Dhaka Area | World bank | WB | Aug 2009 to Feb 2010 |
| 108 | Identification of gas seepage and its control from Titas gas field and preparation of environmental management plan (EMP) of BGFCL and Brahmanbaria. | Brahambaria | BGFCL | ADB | Aug 2009 to Oct 2009 |
| 109 | Designing integrated package of PPP options for industrial waste water treatment (CETP) and reuse in greater Dhaka | Dhaka, Gazipur, Narayangonj, Nasingdi | World Bank | WB | Aug 2009 to Jan 2010 |
| 110 | Treatability study of effluent for design of GlaxoSmithKline Bangladesh Ltd. Pharmaceutical Industry ETP project. | Chittagong | GlaxoSmithKline Bangladesh Ltd. | GlaxoSmithKline Bangladesh Ltd. | Jun 2009 to Sep 2009 |
| 111 | Design, drawing, supervision of Civil work of ETP, ETP equipment installation of Novartis Pharmaceutical Ltd. Turnkey project | Cherag Ali, Tongi, Gazipur | Novarties Pharmaceutical Ltd. | Novarties Pharmaceutical Ltd. | Jun 2009 May 2010 |
| 112 | IEE, EIA and EMP of Asian University for Women | Pahatoli Chittagong. | Asian University for Women | Asian University for Women | Mar 2009 to Aug 2010 |
| 113 | EIA, EMP, ETP treatability study of United Sugar Mills Ltd. Design, drawing, supervision of Civil, E/M equipment installation of 10m3/hr ETP of United Sugar Mills Ltd. turnkey project | Meghnaghat, Sonargaon, Narayangonj | Meghnagroup of industries | Meghna group of industries | May 2009 to Jul 2010 |
| 114 | Design, drawing, supervision of Civil work of 15m3/hr ETP, ETP equipment installation of Molla Dyeing and Printing Industries Ltd., | Demra, Narayangonj | Molla Dyeing and Printing Industries Ltd., | Molla Dyeing and Printing Industries Ltd. | May 2009 Jan 2010 |
| 115 | Expansion of Design, drawing, supervision of Civil work of 100m3/hr ETP, ETP equipment installation of Pakiza Dyeing and Printing Industries Ltd., | Savar, Dhaka | Pakiza Dyeing and Printing Industries Ltd., | Pakiza Dyeing and Printing Industries Ltd. | Mar 2009 to Sep 2009 |
| 116 | IEE, EIA, EMP of CETP (300 m3/hour) of Thermax Group of industries | Narsingdi | Thermax Group of industries | Thermax Group of industries | Jan 2009 to April 2009 |
| 117 | Review of Design, drawing of 150m3/hr ETP, Basundhara Newsprint and Duplex Board Industries Ltd., | Sonargaon, Narayangonj | Basundhara Newsprint and Duplex Board Industries Ltd., | Basundhara Newsprint and Duplex Board Industries Ltd. | Nov 2008 to Dec 2008 |
| 118 | Review of Design, drawing of 150m3/hr ETP, Basundhara Paper Mills Ltd., | Sonargaon, Narayangonj | Basundhara Paper Mills Ltd., | Basundhara Paper Mills Ltd., | Nov 2008 Dec 2008 |
| 119 | IEE, EIA, EMP of CETP (300 m3/hour) of Thermax Group of industries | Narsingdi | Thermax Group of industries | Thermax Group of industries | Oct 2008 to Feb 2009 |
| 120 | Preparation of IEE report for site clearance, EIA report for Environmental clearance from DOE and design, drawing supervision of 15m3/hr ETP of Phoenix Home Textile Ltd. | Tongi, BSCIC Industrial Area | Phoenix Home Textile. | Phoenix Home Textile. | May 2008 to Feb 2009 |
| 121 | Design and Construction supervision of Basundhara Steel Complex Ltd., 5m3/hr ETP | Manikgonj | Bashundhara Steel, Ltd | Bashundhara Steel, Ltd | Apr 2008 to Dec 2008 |
| 122 | Preparation of Design, drawing, supervision of Construction work and electrical, mechanical installation, commissioning of Sonargaon Dyeing & Printing Industries Ltd., ETP. | Tejgaon Industrial area | Sonargaon Dyeing and Printing Ltd. | Sonarga on Dyeing and Printing Ltd | Mar 2008 Apr 2009 |
| 123 | EIA of Chemical Industries of Rainbow Chemicals Ltd. | BSCIC, industrial area, Tangail | Rainbow Chemicals Ltd. | Private | Mar 2008 to Nov 2008 |
| 124 | Design, Construction supervision of ETP turnkey project Eskayef Bangladesh Ltd. Pharmaceutical Industry. | Gazipur | Eskeyef Bangladesh Ltd. | Eskeyef Bangladesh Ltd. | Dec 2007 to May 2008 |
| 125 | EIA Study of Gazi Cement Mills Ltd. | Palash, Narshindi | Gazi Group | Gazi group | Jan 2007 to Apr 2008 |
| 126 | Industrial Environmental Audit on Textile dyeing and Vegetable Oil Company. | Tongi BSCIC l/A, Tongi l/A & Narayangoni | IWM | WB | Jul 2006 to Aug 2006 |